Laying brick in the rain is rarely ideal, but sometimes the schedule demands it. With the right prep, you can keep mortar workable and the wall sound. This guide covers how to protect fresh masonry, adjust your mix, and handle a sudden downpour.
What You’ll Need
- Bricks (dry or lightly damp, not soaked)
- Mortar mix (use a bit less water than normal)
- Hawk and trowel
- Level, string line, and line blocks
- Plastic sheeting or tarps
- Scaffold or sturdy ladder (if working high)
- Sponge and bucket of clean water
- Stiff brush for cleaning
- Mixing board or wheelbarrow
- Protective clothing and non-slip boots
Step-by-Step
- Check the forecast. If heavy rain or thunderstorms are predicted within a few hours, postpone. Light drizzle is manageable; a downpour is not.
- Set up overhead cover. Erect a simple canopy or tarp over the work area, sloped so water runs off away from the wall. Secure it well against wind.
- Protect the footing. Cover the foundation and surrounding ground with plastic to keep mud from splashing onto your fresh mortar.
- Dry your bricks. If bricks have been stored outside, they may be wet. Wet bricks repel mortar and cause slippage. Wipe them with a dry cloth or let them air out under cover until they are just slightly damp, not shiny.
- Mix mortar drier. Use a little less water than the manufacturer suggests. The mortar should hold its shape when you squeeze it, but not be sticky. A stiffer mix resists washout better.
- Lay a short test section. Place a few bricks and let them sit for a few minutes. If the mortar starts to run or the bricks slide, it’s too wet—add more dry mix.
- Work in small batches. Mix only what you can use within about half an hour. In humid air, mortar sets slower, so you have time, but it also stays vulnerable longer.
- Butter each joint fully. Fill head joints completely. A full joint leaves less space for water to enter and wash out the mortar.
- Lay in a staggered pattern. Start at a corner and work outward. Use a level and string line to keep courses straight and plumb.
- Finish joints immediately. Once you complete a course, tool the joints with a jointer. Do not wait until the end of the day—rain will erode unfinished joints.
- Cover the fresh wall. After each work session, drape plastic sheeting over the top of the wall and down both faces. Weight the edges with bricks so wind doesn’t lift it.
- Keep the top protected. If you stop mid-wall, cap the last course with a plank or a thick layer of plastic held down tightly. Water sitting on top can soften mortar for hours.
- Clean splashes immediately. If rain splashes mud onto the face of the wall, wipe it off with a damp sponge before it dries. Dried mortar smears are hard to remove later.
- Let it cure under cover. Keep the wall covered for at least a couple of days after the rain stops. Mortar needs time to gain strength; too much moisture early on weakens it.
Common Mistakes
- Using wet bricks. Wet bricks slide on mortar and create weak bonds. Always dry them first.
- Mixing mortar too wet. A soupy mix washes out of joints and leaves voids.
- Ignoring overhead cover. Even a light drizzle can damage fresh mortar if it hits directly.
- Leaving the top exposed. Water pooling on the top course seeps into the wall and softens the mortar.
- Touching the wall too soon. If you try to adjust bricks after mortar has started to set, you’ll create cracks that let water in.
Tips
- Use a mortar mix with a plasticizer or a waterproofing additive—these help the mix resist water penetration.
- If you have a choice, lay brick on a day with light, intermittent drizzle rather than steady rain. You can pause during heavier bursts.
- Keep a dry tarp folded nearby to throw over the wall the moment rain starts.
- For the first few courses, use a slightly drier mix than usual. The lower courses carry the most load and need the strongest bond.
- After finishing, mist the wall lightly with water if it dries too fast (sunny, windy day). But in rain, skip this—it’s already damp.
Troubleshooting
- Mortar is washing out of joints. Stop laying. Cover the wall immediately. Once the rain stops, let the mortar dry slightly, then repoint the affected joints with fresh mortar.
- Bricks are sliding out of place. Remove them, clean off the wet mortar, dry the bricks, and re-lay with a stiffer mix. Do not try to push them back in place—this breaks the bond.
- Efflorescence (white stains) appears later. This is salts drawn out by moisture. Brush off with a stiff brush when dry. It usually fades over time and is not a structural issue.
- Wall looks uneven after rain. Check for settlement. If a section has sunk, you may need to take it down and rebuild. If it’s just a few millimeters, you can level the next course.
- Mortar set too fast. In warm, humid rain, mortar can skin over quickly. If it becomes too stiff to tool, leave it—don’t add water. Tool it lightly after it hardens slightly.
Frequently Asked Questions
- Can I lay brick in heavy rain? No. Heavy rain washes out mortar and ruins the wall. Wait for lighter conditions or set up a solid canopy that fully covers the work area.
- Do I need to cover the wall after every session? Yes, especially if rain is expected. Even overnight dew can affect fresh mortar. Always cover the top and sides.
- How long does mortar take to dry in wet weather? It depends on temperature and humidity, but expect it to take longer than on a dry day—often a day or more. Keep it covered until it’s firm to the touch.
- Can I use wet bricks if I dry them with a cloth? Yes, but you must dry them thoroughly. A damp surface is fine, but a soaked brick will cause the mortar to slide.
- What if my mortar gets too wet from rain? If it’s still workable, mix in some dry mortar to stiffen it. If it’s already set, discard it and mix fresh.
- Is it okay to add waterproofing to mortar? Yes, many masons use a liquid waterproofing admixture. Follow the manufacturer’s instructions—too much can weaken the mortar.
Laying a Brick Wall in the Rain: Step-by-Step